NTPC’s Lara Super Thermal Power Station in Chhattisgarh is set to be inaugurated by Prime Minister Narendra Modi

NTPC’s Lara Super Thermal Power Station in Chhattisgarh is set to be Inaugurated by Prime Minister Narendra Modi

NTPC’s Lara Super Thermal Power Station in Chhattisgarh is set to be inaugurated by Prime Minister Narendra Modi  On February 24, 2024, Prime Minister Shri Narendra Modi is set to dedicate Stage I of NTPC’s Lara Super Thermal Power Station and lay the foundation stone for Stage II of the Lara Super Thermal Power Project in Raigarh district, Chhattisgarh. This significant event will mark a milestone in India’s power sector and contribute to the nation’s energy security.

NTPC’s Lara Super Thermal Power Station in Chhattisgarh is set to be Inaugurated by Prime Minister Narendra Modi

Key Highlights

Stage-I Inauguration:

  • The Prime Minister will inaugurate Stage I of the Lara Super Thermal Power Station, comprising two units of 800 MW each.
  • This stage represents a substantial investment of approximately Rs. 15,800 crores.

Foundation Stone for Stage II:

  • Additionally, the Prime Minister will lay the foundation stone for Stage II of the Lara Super Thermal Power Project, which will also have two units of 800 MW each.
  • The expansion project will utilize the available land from Stage I, requiring no additional land acquisition. Rs. 15,530 crores is the investment for Stage II

Fuel Supply:

  • Coal from NTPC’s Talaipalli Coal block will fuel the power station, transported through the Merry-Go-Round (MGR) system.
  • This ensures a steady and cost-effective supply of electricity around the clock.

Advanced Technology:

  • Stage-I is equipped with highly efficient supercritical technology, while Stage-II will utilize Ultra Super Critical technology.
  • These advancements will lead to lower Specific Coal Consumption and reduced carbon dioxide emissions, contributing to environmental sustainability.

Power Allocation:

  • Chhattisgarh will be allocated fifty per cent of the power generated from both Stage I and Stage II.
  • However, the project will also benefit other states such as Gujarat, Madhya Pradesh, Maharashtra, Goa, Daman & Diu, and Dadra and Nagar Haveli,
  • Thereby enhancing the overall power scenario in the region.

Employment Opportunities:

  • The installation of this power project is generating both direct and indirect employment opportunities in the area.
  • Additionally, NTPC is undertaking various Community Development initiatives in nearby regions, focusing on education, drinking water, sanitation, health, and women’s empowerment.

Conclusion

The inauguration of NTPC’s Lara Super Thermal Power Station and the commencement of Stage-II construction underscore India’s commitment to sustainable and affordable energy production. These initiatives not only strengthen the nation’s energy infrastructure but also contribute to socio-economic development and environmental conservation. Prime Minister Narendra Modi’s dedication to enhancing India’s power sector reflects the government’s vision for a self-reliant and prosperous nation.

SOURCE

Leave a Reply

Your email address will not be published. Required fields are marked *